Building a home with a well

Building permit well tests

Building a home with a well?

Before the county signs off, it wants proof your well makes enough water. We run the pump test your county asks for, take the readings, collect the water sample for the lab, and write it up for your permit.

Flow Test: go with the flow

What the county wants to see

How much water

A timed pump test: gallons per minute, the water level while pumping, and how fast the well recovers.

Is it safe to drink

A lab test for bacteria and nitrate. We collect the sample and get it to a certified lab.

The paperwork

The readings written up the way your county wants them, on its own forms where it has them.

Benton County

Benton requires a pump test on the county’s own forms for every new home on a well. The well is pumped for at least 4 hours at a rate that holds a steady water level, with readings every 30 minutes, then the recovery is measured after the pump stops. The county also wants a coliform and nitrate test, and both tests must be from the last 12 months.

We fill out Benton’s Pump Test Submittal Form and Recovery Worksheet from our readings. Splitting land? Benton calls for a 4-hour or a 12-hour test, depending on parcel size.

Lane County

Lane’s code calls for a 5-hour pump test, and the well must average at least 5 gallons per minute. A well that makes 1 to 5 gpm needs a storage tank in the plans. Lane also wants a certified lab test for total coliform, E. coli and nitrate/nitrite.

Our Lane report shows the static water level, pumping level, drawdown, recovery, residual drawdown, pumping rate and specific capacity.

Building somewhere else?

Every county handles this differently, and some leave it to the planner. Tell us where the property is. We’ll find out what the county needs for your permit and test to it.

Get your well test on the calendar

Call or text (503) 877-4403, or send us the address and county.

County rules quoted from: Benton County Water Supply Requirements for Building Permits (rev. April 2022); Benton County Water Supply Requirements for Partitions and Subdivisions; Lane Code Chapter 13. Rules change, so we confirm with the county on every job.

© 2026 Flow Test Inc. All rights reserved. Oregon CCB #235010. Building Codes Division license PP15 (plumbing and limited pump installation). · (503) 877-4403
Scroll to Top